U.S. Official No. 1057981
Not yet on Master's MateREEL CHANGE ORDER, a leisure boat flying the American flag, measures 12.4 metres on deck. REEL CHANGE ORDER has a beam of 4.2 m and a 2.1 m draft. Look for U.S. official number 1057981. Claim REEL CHANGE ORDER free on the Master's Mate Safety Initiative Network and let nearby cruisers have her back.
Anchor alarms that wake you, a live camera at the dock, and weather you can trust before every run.
Look after her — claim free →Takes 60 seconds · Your data stays yours · Built by cruisers, for cruisers
Joining the Safety Initiative Network doesn't just put REEL CHANGE ORDER on the map. It hands you the full bridge:
© 2026 Master’s Mate. All rights reserved.