U.S. Official No. 1140702
Not yet on Master's MateCHANGE ORDER is a leisure boat under the American flag, measuring 11.2 metres. She's built with 4.2 metres in the beam and a 2.1 m draft. Her registration reads U.S. official number 1140702. Put CHANGE ORDER on the Master's Mate Safety Initiative Network — free to claim, with a whole fleet watching out for her.
Anchor alarms that wake you, a live camera at the dock, and weather you can trust before every run.
Look after her — claim free →Takes 60 seconds · Your data stays yours · Built by cruisers, for cruisers
Joining the Safety Initiative Network doesn't just put CHANGE ORDER on the map. It hands you the full bridge:
© 2026 Master’s Mate. All rights reserved.