Sign up free Dashboard Log out
Master's MateSafety Initiative Network
The Master's Mate Safety Initiative Network (MMSIn) — like AAA for the ocean, but free & community-driven. Cruisers keeping each other safe: anchor-drag & distress alerts, a verified captains directory, and a watch network that has your back.
Recreational

CHANGE ORDER

U.S. Official No. 1168563

Not yet on Master's Mate
Type
Recreational
Flag
USAUSA
Length
13.7 m
Beam
4.3 m
Draft
2.2 m
Hull ID
SERP6274G405
First reported
Jun 2026
AIS reports
1

Out of the United States, CHANGE ORDER is a 13.7-metre leisure boat. She carries a beam measuring 4.3 metres and a 2.2 m draft. Look for U.S. official number 1168563. There's a place for CHANGE ORDER on the Master's Mate Safety Initiative Network — free, community-driven, like AAA for the ocean.

Free forever · No credit card · for recreational captains

Keep CHANGE ORDER looked after — even when you’re not aboard.

Anchor alarms that wake you, a live camera at the dock, and weather you can trust before every run.

Look after her — claim free →

Takes 60 seconds · Your data stays yours · Built by cruisers, for cruisers

Wherever CHANGE ORDER roams, you're never out there alone.
Thousands of cruisers on the Master's Mate Network — ready to help the moment something goes wrong.
Free with your claim · for recreational captains

The most powerful cruising platform ever built — yours, free.

Joining the Safety Initiative Network doesn't just put CHANGE ORDER on the map. It hands you the full bridge:

Anchor Watch
GPS-precise drag alarms that actually wake you — and your whole crew. Sleep through the night.
Onboard Cameras
Watch your boat from anywhere — live feeds and 24h recording, straight from your gateway.
Weather & Routing
GRIB wind, swell & current on the chart. Plan passages with ETA-calibrated forecasts per leg.
Worldwide Charts
Navionics-grade vector charts, satellite & raster overlays, online or off. Your whole cruising ground.
Systems Monitoring
Batteries, bilge, tanks, Victron & NMEA 2000 telemetry — your whole boat on one dashboard.
Live AIS & Traffic
See every vessel around you in real time. Closest-approach warnings before they matter.
Distress Mesh
Mayday & Pan-Pan that ripple out to nearby cruisers — a watch network that has your back.
Hail Any Captain
A verified captains directory + direct hailing. Reach the boat next to you, or across the bay.
Claim CHANGE ORDER and switch it all on
Free to join · nothing to install to start · cancel anytime
Claim free → unlock everything

About CHANGE ORDER

What kind of vessel is CHANGE ORDER?
CHANGE ORDER is a Recreational flagged to United States of America.
What is CHANGE ORDER's U.S. Official No.?
CHANGE ORDER's U.S. Official No. is 1168563.
How big is CHANGE ORDER?
CHANGE ORDER is about 13.7 m long, 4.3 m on the beam, drawing 2.2 m.
Is CHANGE ORDER on the Master's Mate Safety Initiative Network?
Not yet. If CHANGE ORDER is your boat, you can claim it free and join the Master's Mate Safety Initiative Network (MMSIn).

© 2026 Master’s Mate. All rights reserved.