Sign up free Dashboard Log out
Master's MateSafety Initiative Network
The Master's Mate Safety Initiative Network (MMSIn) — like AAA for the ocean, but free & community-driven. Cruisers keeping each other safe: anchor-drag & distress alerts, a verified captains directory, and a watch network that has your back.
Recreational

ANOTHER CHANGE ORDER

U.S. Official No. 1280038

Not yet on Master's Mate
Type
Recreational
Flag
USAUSA
Length
11.5 m
Beam
3.3 m
Draft
1.8 m
Hull ID
FGQ8C066A303
First reported
Jun 2026
AIS reports
1

On the American registry, ANOTHER CHANGE ORDER is an 11.5-metre cruising boat. She's built with 3.3 metres in the beam and a 1.8-metre draft. She's listed under U.S. official number 1280038. Claim ANOTHER CHANGE ORDER free and let the Master's Mate Safety Initiative Network keep an eye on her, on the water or off.

Free forever · No credit card · for recreational captains

Keep ANOTHER CHANGE ORDER looked after — even when you’re not aboard.

Anchor alarms that wake you, a live camera at the dock, and weather you can trust before every run.

Look after her — claim free →

Takes 60 seconds · Your data stays yours · Built by cruisers, for cruisers

Wherever ANOTHER CHANGE ORDER roams, you're never out there alone.
Thousands of cruisers on the Master's Mate Network — ready to help the moment something goes wrong.
Free with your claim · for recreational captains

The most powerful cruising platform ever built — yours, free.

Joining the Safety Initiative Network doesn't just put ANOTHER CHANGE ORDER on the map. It hands you the full bridge:

Anchor Watch
GPS-precise drag alarms that actually wake you — and your whole crew. Sleep through the night.
Onboard Cameras
Watch your boat from anywhere — live feeds and 24h recording, straight from your gateway.
Weather & Routing
GRIB wind, swell & current on the chart. Plan passages with ETA-calibrated forecasts per leg.
Worldwide Charts
Navionics-grade vector charts, satellite & raster overlays, online or off. Your whole cruising ground.
Systems Monitoring
Batteries, bilge, tanks, Victron & NMEA 2000 telemetry — your whole boat on one dashboard.
Live AIS & Traffic
See every vessel around you in real time. Closest-approach warnings before they matter.
Distress Mesh
Mayday & Pan-Pan that ripple out to nearby cruisers — a watch network that has your back.
Hail Any Captain
A verified captains directory + direct hailing. Reach the boat next to you, or across the bay.
Claim ANOTHER CHANGE ORDER and switch it all on
Free to join · nothing to install to start · cancel anytime
Claim free → unlock everything

About ANOTHER CHANGE ORDER

What kind of vessel is ANOTHER CHANGE ORDER?
ANOTHER CHANGE ORDER is a Recreational flagged to United States of America.
What is ANOTHER CHANGE ORDER's U.S. Official No.?
ANOTHER CHANGE ORDER's U.S. Official No. is 1280038.
How big is ANOTHER CHANGE ORDER?
ANOTHER CHANGE ORDER is about 11.5 m long, 3.3 m on the beam, drawing 1.8 m.
Is ANOTHER CHANGE ORDER on the Master's Mate Safety Initiative Network?
Not yet. If ANOTHER CHANGE ORDER is your boat, you can claim it free and join the Master's Mate Safety Initiative Network (MMSIn).

© 2026 Master’s Mate. All rights reserved.