Sign up free Dashboard Log out
Master's MateSafety Initiative Network
The Master's Mate Safety Initiative Network (MMSIn) — like AAA for the ocean, but free & community-driven. Cruisers keeping each other safe: anchor-drag & distress alerts, a verified captains directory, and a watch network that has your back.
Recreational

CRITICAL PATH

U.S. Official No. 1364638

Not yet on Master's Mate
Type
Recreational
Flag
USAUSA
Length
11.4 m
Beam
3.4 m
Draft
1.9 m
First reported
Jun 2026
AIS reports
1

Registered in the United States, CRITICAL PATH is an 11.4-metre recreational vessel. She has a 3.4 m beam and a draft measuring 1.9 metres. Find her under U.S. official number 1364638. Claim CRITICAL PATH free on the Master's Mate Safety Initiative Network and let nearby cruisers have her back.

Free forever · No credit card · for recreational captains

Keep CRITICAL PATH looked after — even when you’re not aboard.

Anchor alarms that wake you, a live camera at the dock, and weather you can trust before every run.

Look after her — claim free →

Takes 60 seconds · Your data stays yours · Built by cruisers, for cruisers

Wherever CRITICAL PATH roams, you're never out there alone.
Thousands of cruisers on the Master's Mate Network — ready to help the moment something goes wrong.
Free with your claim · for recreational captains

The most powerful cruising platform ever built — yours, free.

Joining the Safety Initiative Network doesn't just put CRITICAL PATH on the map. It hands you the full bridge:

Anchor Watch
GPS-precise drag alarms that actually wake you — and your whole crew. Sleep through the night.
Onboard Cameras
Watch your boat from anywhere — live feeds and 24h recording, straight from your gateway.
Weather & Routing
GRIB wind, swell & current on the chart. Plan passages with ETA-calibrated forecasts per leg.
Worldwide Charts
Navionics-grade vector charts, satellite & raster overlays, online or off. Your whole cruising ground.
Systems Monitoring
Batteries, bilge, tanks, Victron & NMEA 2000 telemetry — your whole boat on one dashboard.
Live AIS & Traffic
See every vessel around you in real time. Closest-approach warnings before they matter.
Distress Mesh
Mayday & Pan-Pan that ripple out to nearby cruisers — a watch network that has your back.
Hail Any Captain
A verified captains directory + direct hailing. Reach the boat next to you, or across the bay.
Claim CRITICAL PATH and switch it all on
Free to join · nothing to install to start · cancel anytime
Claim free → unlock everything

About CRITICAL PATH

What kind of vessel is CRITICAL PATH?
CRITICAL PATH is a Recreational flagged to United States of America.
What is CRITICAL PATH's U.S. Official No.?
CRITICAL PATH's U.S. Official No. is 1364638.
How big is CRITICAL PATH?
CRITICAL PATH is about 11.4 m long, 3.4 m on the beam, drawing 1.9 m.
Is CRITICAL PATH on the Master's Mate Safety Initiative Network?
Not yet. If CRITICAL PATH is your boat, you can claim it free and join the Master's Mate Safety Initiative Network (MMSIn).

© 2026 Master’s Mate. All rights reserved.