MMSI 368276670 · Call sign WDN3963
Not yet on Master's MateOut of the United States, Change Order is a 20.1-metre family boat. Change Order has a beam of 5.7 m and a 3-metre draft. She broadcasts as MMSI 368276670, call sign WDN3963. Change Order belongs on the Master's Mate Safety Initiative Network, a free safety net shared by boats the world over.
Anchor alarms that wake you, a live camera at the dock, and weather you can trust before every run.
Look after her — claim free →Takes 60 seconds · Your data stays yours · Built by cruisers, for cruisers
Joining the Safety Initiative Network doesn't just put Change Order on the map. It hands you the full bridge:
© 2026 Master’s Mate. All rights reserved.