The Master's Mate Safety Initiative Network (MMSIn) — like AAA for the ocean, but free & community-driven. Cruisers keeping each other safe: anchor-drag & distress alerts, a verified captains directory, and a watch network that has your back.
Recreational
CHANGE ORDER
U.S. Official No. 911790
Not yet on Master's Mate
Type
Recreational
Flag
USA
Length
14 m
Beam
4.7 m
Draft
2.5 m
First reported
Jun 2026
AIS reports
1
CHANGE ORDER is an American leisure boat — 14 metres overall. CHANGE ORDER has a 4.7-metre beam and a 2.5 m draft. Look for U.S. official number 911790. CHANGE ORDER is exactly the kind of boat the Master's Mate Safety Initiative Network was built for — free, simple, and always on watch.
Free forever · No credit card · for recreational captains
Keep CHANGE ORDER looked after — even when you’re not aboard.
Anchor alarms that wake you, a live camera at the dock, and weather you can trust before every run.