The Master's Mate Safety Initiative Network (MMSIn) — like AAA for the ocean, but free & community-driven. Cruisers keeping each other safe: anchor-drag & distress alerts, a verified captains directory, and a watch network that has your back.
Recreational
CHANGE ORDER
U.S. Official No. 934297
Not yet on Master's Mate
Type
Recreational
Flag
USA
Length
13 m
Beam
4.3 m
Draft
2.4 m
First reported
Jun 2026
AIS reports
1
On the American registry, CHANGE ORDER is a 13-metre leisure boat. She's built with 4.3 metres in the beam and a 2.4 m draft. Look for U.S. official number 934297. CHANGE ORDER can join the Master's Mate Safety Initiative Network for free: think of it as a watch network that has every boat's back.
Free forever · No credit card · for recreational captains
Keep CHANGE ORDER looked after — even when you’re not aboard.
Anchor alarms that wake you, a live camera at the dock, and weather you can trust before every run.